*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Camp Okihi Water Line Kern River Crossing

Scope of Services The project, in general, consists of providing all labor and materials to install a 4-inch ductile iron water pipe within a 30-inch steel casing installed a minimum of 15 feet underneath the Kern River via the bore-and-jack installation method. The water line and appurtenances will be connected below grade to an existing water meter on the south and to an existing water system on the north. A temporary jacking pit, receiving pit and sump will be constructed to facilitate the installation. The temporary facilities will be removed upon completion. Work shall be scheduled to start on November 1, 2024, or as soon after as possible. This start date satisfies the requirement to do work when the flows in the Kern River are at their lowest.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/25/2024 – 11:00 AM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 05/09/2024 – 10:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Nicole Rosales 661-868-3054
nrosales@kerncounty.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/25/2024 – 11:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.