BWP Campus Stormwater Improvement Project

Scope of Services To comply with Regional, State and Federal water quality standards, Burbank Water and Power (BWP) is proposing to construct onsite storm water improvements, as well as improvements to the adjacent off-site storm water drainage system. The project will divert storm water that is generated offsite by constructing a new storm water pipeline, manholes, and connection to the Burbank Western Channel. Onsite drainage improvements would consist of diverting flow from an existing 36-inch diameter pipe into an on-site filter, then into an underground vault within the northeast portion of the BWP Campus. The treated storm water would either be used for cooling tower make-up water or infiltrated into the ground, or a combination of the two all in compliance with the City's Bid Schedule No. 1504.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/15/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 01/16/2024 – 10:00 AM
Engineer’s Est. Min: $10100000
Engineer’s Est. Max: $10100000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:BS No. 1504

Lisa Villegas 818-238-5466
BurbankPurchasing@burbankca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/15/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.