*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Birney Playground Installation Project

Scope of Work: Removeallexisting playground equipment units as shown on the Demolition Plan along with removing the existing poured in place rubber surfacing areas around each playground equipment unit. (See the proposed renderings showing the poured in place pattern style for when removing existing- coordinate with District) Prepare areas where a new unit will go. Also refer to the footing detail for the depth and prep work of the new equipment.Install new playground equipment units per Davebang’s specifications as shown onthe plan and documents. Install new Poured-in-Place New Rubber Surfacing, 3.5” thickness for a 8’-0” critical fall height. Color: 50% black / 50%standard color of choice by the site/District (Approx. 402 sq. ft. combined) at the 3 new equipment units as shown on the renderings.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 11/02/2023 – 10:00 AM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 10/25/2023 – 9:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:685

Jeff Fitchett
jfitchett@erusd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 11/02/2023 – 10:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.