*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Bikeways Connectivity Study

SCOPE OF WORK Bikeways Connectivity Study The study will evaluate the Master Plan of Arterial Highways (MPAH) segments identified as having excess roadway capacity in the MPAH Guidance Assessment for potential lane conversion to class IV bikeways. The study will evaluate these MPAH segments and their potential for connecting potential origins or destinations and regional bikeway networks using class IV bikeways. The Bikeways Connectivity Study shall augment work already done in the MPAH Guidance Assessment, Regional Bikeways Strategies, and OC Active by focusing on identifying low-level-of-stress bikeway connections.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/07/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 01/16/2024 – 1:30 PM
Engineer’s Est. Min: $500000
Engineer’s Est. Max: $500000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:(RFP) 3-2997

Sue Ding 714.560.5631
sding@octa.net

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/07/2024 – 2:00 PM

Other Projects

Vegetation Establishment

Description of Services for Vegetation Establishment Inspection, Maintenance, and Replacement of Irrigation System Components Irrigation System Inspection The Contractor will

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.