Kitchen Infrastructure Project
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Jason Vega (626) 744-7358
jvega@cityofpasadena.net
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
THIS PROJECT INCLUDES 2024 PAVEMENT PRESERVATION PROJECT TOTAL PROJECT APPROXIMATELY 19.90 MILES IN LENGTH WITH APPURTENANT WORK THERETO IN SAN
SCOPE OF WORK Contractor will furnish labor, equipment, tools and materials necessary for site work and construction of includes water
Scope of Services The Project will address traffic congestion and improve freeway access for the region by reconstructing the existing
Street Improvements on various streets. The project consists of pavement cold mill and ARHM overlay. It includes replacing sidewalk, pavement
SCOPE OF WORK. The Contractor shall perform within the time stipulated the contract as herein defined, and shall provide all
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.