*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Apple Valley Road Bus Turnout

DESCRIPTION OF WORK: The Project generally consists of Providing necessary labor, equipment, and materials to construct a concrete transit bus pad, concrete curb, concrete sidewalk, relocate existing bus shelter, and associated work in accordance with the project plans, standard specifications, special provisions, and as directed by the Town Engineer. Work on the Project shall be completed within 30 working days.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/20/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $150000
Engineer’s Est. Max: $150000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2023-03

ppereira@applevalley.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/20/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.