Vinyl Plank Flooring Install
Scope of Services Installing approximately 10,760 square feet of commercial grade vinyl plank flooring within the three levels of the
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Sarah Froeber, Buyer
sfroeber@cityofredding.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Services Installing approximately 10,760 square feet of commercial grade vinyl plank flooring within the three levels of the
General work description: This project will consist of constructing sidewalk improvements from the
Upper Pacific (Beach and Village) Parking Lot
Scope of Services Removal and or installation of multiple portable classroom buildings at multiple Kern High School District Campuses.
General work description: Modifying fiber optic cable systems.
NOTICE IS HEREBY GIVEN that the Board of Education of the HACIENDA LA PUENTE UNIFIED SCHOOL DISTRICT, of Los Angeles
General work description: Construct ADA curb ramps, sidewalk, and driveway.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.