For Construction on State Highway in Kern County at Various Locations in District 09 on Route 14, 178
General work description: Place pavement delineation and modify signals and lighting systems.
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Katie Martel (626) 570-3251
kmartel@cityofalhambra.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
General work description: Place pavement delineation and modify signals and lighting systems.
Scope of Services The following tasks shall be routinely performed by the Contractor: Perform AQMD 1150.1 surface emission air monitoring
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
S C O P E O F S E R V I C E S The scope of services includes
DESCRIPTIONS OF THE PROJECTS AT SCHOOL SITE(S) CONTRACTOR SHALL NOT BEGIN WORK ON THE CONSTRUCTION PHASE OF THE PROJECT UNTIL
SCOPE OF SERVICES Traffic signal and street light maintenance services may include, but will not necessarily be limited to the
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.