*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Alleys North of Foster Road Pavement Rehabilitation

Scope of Services The work to be performed under this Contract generally consists of pavement rehabilitation on five Alleys North of Foster Rd, between Woodruff Road and Lakewood Boulevard, as shown on the Plan. This project consists of the removal of the existing asphalt pavement and base or subgrade materials, and construction of asphalt concrete (AC) base course and AC overlay. Work also includes the reconstruction of Portland cement concrete (PCC) alley intersections, installation of PCC curb ramp, installation of PCC v-gutters, repair of damaged PCC curb, gutter, and other concrete improvements, adjustments of manhole and utility valve covers to the new grade, traffic control and all appurtenant work.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/14/2024 – 11:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:23-02

562-904-7110
faoun@downeyca.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/14/2024 – 11:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.