OWTP Headworks Variable Frequency Drive Replacement Project
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Long Tang
Long.Tang@calvet.ca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
Scope of Services Removal and or installation of multiple portable classroom buildings at multiple Kern High School District Campuses.
General work description: Modifying fiber optic cable systems.
General work description: Modify FO cable, camera & roadside weather information systems.
SCOPE OF SERVICES The Westside Basin Desilting Project (Project) was completed in 2017, and the City contracted with a Consultant
Scope of Services Scope of work includes sidewalks, curb ramps, curb & gutter, cross gutters, irrigation and landscaping for the
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.