*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

21-08 San Lorenzo High School Access Compliance Improvements and Intrusion Control Measures

The Project consists of Site Work Paving repair and path of travel upgrades at the Students' parking lot and adjacent quad Building Work Restrooms accessibility compliance safety upgrades for students and staff at building A, B, H, and W. Required mechanical, plumbing, electrical, fire - alarm infrastructure upgrades (at upgraded restrooms) and removal, disconnecting, re-reconnecting sprinkler piping systems as required due to (n) HVAC ductwork at soffit located at the end corridors of building A, B, C, & D. No alteration or changes to (e) sprinkler system design. Replacement of non-compliant drinking fountains at the path of travel. Replacement of various damaged doors and frames

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 07/19/2023 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 06/13/2023 – 2:00 PM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:21-08

Behrooz Danish,
bdanish@slzusd.org

Ms. Jennifer Edwall
jedwall@slzusd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 07/19/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.