2024 Pavement Preservation Project
THIS PROJECT INCLUDES 2024 PAVEMENT PRESERVATION PROJECT TOTAL PROJECT APPROXIMATELY 19.90 MILES IN LENGTH WITH APPURTENANT WORK THERETO IN SAN
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Kelly Ju (209) 937-8727
kelly.ju@stocktonca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
THIS PROJECT INCLUDES 2024 PAVEMENT PRESERVATION PROJECT TOTAL PROJECT APPROXIMATELY 19.90 MILES IN LENGTH WITH APPURTENANT WORK THERETO IN SAN
General work description: Construct ADA curb ramps, sidewalk, and driveway.
Scope of Services Trucking Services in Support of Minor Street Repairs
Scope of Services The awarded contractor will rehabilitate the entire pavement from 9th Street to Idyllwild Drive consisting of roughly
Replacing designated roofs and perform miscellaneous work as outlined in the Drawings
and Specification.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.