Old Orchard Park Phase I Construction
Project Description: The project to provide Phase I improvements including; an expanded playground area with features including new play equipment
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Sandra Huerta (760) 883-2710
purchasinginfo@psusd.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Project Description: The project to provide Phase I improvements including; an expanded playground area with features including new play equipment
Scope of Services The following tasks shall be routinely performed by the Contractor: Perform AQMD 1150.1 surface emission air monitoring
SCOPE OF SERVICES The selected engineering firm’s primary responsibilities shall be to design the Project, including obtaining permits, developing public
Scope of Services Installing approximately 10,760 square feet of commercial grade vinyl plank flooring within the three levels of the
Description Download the Validation of Specifications document from the Documents tab and complete and upload by clicking on the “Place
Scope of Services This project provides for, in general, reducing the number of travel lanes from four to two, constructing
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.