Powell Constructors, Inc.

Requesting sub-bids from the following qualified firms: DBE for the following project.

07-353304: Replace Bridge Railing with Concrete Barrier and Upgrade Lighting on Rte 110

Project Information

Bid Date: 06/14/2022 - 2:00 PM

DBE Proposal Due Date: 06/14/2022 - 1:30 PM

Owner (Agency): California Department of Transportation (Caltrans)

Number (Agency): 07-353304

County: Los Angeles

Location: Los Angeles, CA, USA

Contact Information

Name: Joe Schulte

Phone: 909-356-8880

Fax: 909-356-1299

Website: Powell Constructors, Inc.

Advertised DBE Scope of Work

Powell Constructors, Inc. is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms. ALL BID ITEMS ARE OPEN FOR BID, including items of work normally performed by Powell Constructors, Inc. LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PREPARE WATER POLLUTION CONTROL PROGRAM, WPCP MATERIALS, REMOVE CONCRETE, ROADWAY EXCAVATION, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE BACKFILL (BRIDGE), MAINTAIN EXISTING PLANTED AREAS, IRRIGATION, AGGREGATE BASE, LEAN CONCRETE BASE, HOT MIX ASPHALT, STRUCTURAL CONCRETE (BRIDGE), STRUCTURAL CONCRETE (APPROACH SLAB), PAVING NOTCH EXTENSION, DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, JOINT SEAL, BAR REINFORCING STEEL (BRIDGE), FURNISH SIGN STRUCTURE, INSTALL SIGN STRUCTURE, REMOVE SIGN STRUCTURE, PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE ASPHALT CONCRETE SURFACING, REMOVE CONCRETE DECK SURFACE, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, REFINISH BRIDGE DECK, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL (PORTION), MINOR CONCRETE, REMOVE CONCRETE CURB, MANHOLE FRAME AND COVER, TEMPORARY LIGHTING SYSTEMS (CITY), MODIFING LIGHTING SYSTEMS (CITY), GUARD RAILING DELINEATOR, REMOVE ROADSIDE SIGN, FURNISH SIGN PANELS, INSTALL SIGN, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), CONCRETE BARRIER, REMOVE GUARDRAIL, SALVAGE METAL BRIDGE RAILING, PAVEMENT MARKING & STRIPING, AND TRUCKING. Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and encourage DBE participation.

Where to find the plans & specs?

Caltrans (www.dot.ca.gov) or Powell Constructors Inc by request