Powell Constructors, Inc.

Requesting sub-bids from the following qualified firms: DBE for the following project.

07-336004: Construct Stormwater Treatment Devices on Rte 118

Project Information

Bid Date: 11/08/2022 - 2:00 PM

DBE Proposal Due Date: 11/08/2022 - 1:30 PM

Owner (Agency): California Department of Transportation (Caltrans)

Number (Agency): 07-336004

County: Ventura / San Luis Obispo / Santa Barbara

Location: Saticoy, CA, USA

Contact Information

Name: Joe Schulte

Phone: 909-356-8880

Fax: 909-356-1299

Website: Powell Constructors, Inc.

Advertised DBE Scope of Work

Powell Constructors, Inc. is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms. ALL BID ITEMS ARE OPEN FOR BID, including items of work normally performed by Powell Constructors, Inc. LEAD COMPLIANCE PLAN, DISPUTE RESOLUTION ADVISOR, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PREPARE WATER POLLUTION CONTROL PROGRAM, WPCP MATERIALS, CLEARING AND GRUBBING, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, SAND BEDDING, STRUCTURE BACKFILL, DITCH EXCAVATION, EMBANKMENT, GRAVEL MULCH, EDGING, EROSION CONTROL, COMPOST, INCORPORATE MATERIALS, AGGREGATE BASE, LEAN CONCRETE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, MINOR CONCRETE (MINOR STRUCTURE), BAR REINFORCING STEEL, REMOVE SIGN STRUCTURE, GROSS SOLIDS REMOVAL DEVICE, REINFORCED CONCRETE PIPE, CORRUGATED STEEL PIPE, STEEL FLARED END SECTION, PRECAST CONCRETE PIPE RISER, REMOVE PIPE, REMOVE HEADWALL, CONCRETE (CHANNEL LINING), GABION, ROCK SLOPE PROTECTION, REMOVE CONCRETE SIDEWALK AND DRIVEWAY, MISCELLANEOUS IRON AND STEEL, MANHOLE FRAME AND COVER, MISCELLANEOUS METAL, FENCE, GUARD RAILING DELINEATOR, TREATMENT BMP MARKER, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, PAVEMENT STRIPING, AND TRUCKING. Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and encourage DBE participation.

Where to find the plans & specs?

Caltrans (www.dot.ca.gov) or Powell Constructors Inc by request