Bobolink Storm Drain Project Phase 2
The Work generally consists of: storm water pollution prevention and erosion control, utility
coordination, demolition and removal, traffic control and
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Mariela Delgado (661) 286-4066
mdelgado@santa-clarita.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
The Work generally consists of: storm water pollution prevention and erosion control, utility
coordination, demolition and removal, traffic control and
Scope of Services ELECTRICAL – All labor, materials, and equipment required to provide and install all work necessary and required
Scope of Services ESport Broadcasting Project Furnish prevailing wage labor, materials, specified equipment, transportation, engineering, cabling for an ESport broadcasting
SCOPE OF SERVICES The Scope of Services is not definitive and is intended only as a guide to illustrate the
SCOPE OF WORK The work includes the design and construction of a Class I trail along the Great Redwood Trail
THIS PROJECT INCLUDES FURNISH AND DELIVER SPEED TABLE AND TEMPORARY MEDIAN FURNISHMENT AND INSTALLATION ON CONCRETE ROADWAY SURFACE
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.