Fuel Cell Back Up System Furnish and Install – Re-bid
This project will acquire and install PEM (Protein Exchange Membrane) Fuel Cell backup systems on approximately ten (10) high priority
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Anush Nejad 530-542-6031
anejad@cityofslt.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
This project will acquire and install PEM (Protein Exchange Membrane) Fuel Cell backup systems on approximately ten (10) high priority
Scope of Work – The scope of the Grossmont College 22&23 SM Campuswide Water Heater Replacement PH II project will
Scope of Work This scope outlines the duties required for Landscape Services to four facilities over a period of two
Description of Work: In accordance with the Construction Documents, Contractor shall provide all labor, materials, equipment, tools, transportation, insurance, and
Project Description Central San’s permit to operate stipulates the procedures for recording odor complaints received by the treatment plant (See
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.