Fy 2023-24 Area 3 Slurry Seal Project
SCOPE OF WORK: The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Danny Medina (408) 918-2710
Danny.Medina@faf.sccgov.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK: The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required
Description of Services: Soils and Materials Testing & Geotechnical Services for City projects.
Scope of Services Installation of digital marquees at City of El Cajon recreation centers in accordance with plans and specifications
SCOPE OF WORK: Design and install pad for 500KW generator and transfer switch Level and remove dirt for the generator
PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and
SCOPE OF WORK Contractor shall perform all work as required by, and in strict accordance with, the Contract Documents (the
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.