Cohasset Road Widening and Fire Safety Feasibility Study & Engineering Design
SCOPE OF SERVICES This project is predicted to be a two‐phase project. Phase 1 pertaining to the feasibility study aspect
Become a member for FREE!
*No credit card required*
SCOPE OF SERVICES This project is predicted to be a two‐phase project. Phase 1 pertaining to the feasibility study aspect
Scope of Services The work to be performed, in general, consists of furnishing all materials, equipment, tools, labor, and incidentals
Scope of Services Base Bid: Replacement of existing traffic signal controllers with new 2070 ATC controllers, replacement of existing conflict
Scope of Work. In compliance with all terms and conditions of this Agreement, the Contractor shall provide those services specified
Scope of Work The selected inspection firm will be expected to provide periodic inspection during key moments of construction and
General work description: Cold plane and RHMA/HMA roadway and bridge, & replace culverts.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.