Standard Bid Package and General Provisions for the 2025 Dig Outs
Description A CICP is a formally written proposal for a Contract Change Order. A CICP must be initiated, developed, and
Become a member for FREE!
*No credit card required*
Description A CICP is a formally written proposal for a Contract Change Order. A CICP must be initiated, developed, and
The work includes the following: concrete removal and replacement, concrete grinding, concrete sealant, poured in place aquatic surfacing
DESCRIPTION OF SERVICES REQUIRED Qualified consulting teams shall be led by a California-licensed architect, and include California-licensed structural and mechanical
Scope of Services The Work comprises of furnishing all materials, equipment, tools, labor, supplies, transportation, incidentals, temporary construction of every
Scope of Services The general items of work consist of: Slurry Seal, Surface Preparation and Crack Seal, construct ARAM System
Scope of Services The City of Pomona (the “City”) is soliciting bids from firms for INVITATION FOR BID 2024-56 [Construction]
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.