Reservoir A Filter Valve Replacement
DESCRIPTION OF THE WORK. The Work consists of demolition of existing 18-inch raw water inlet piping; demolition of existing inlet
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
http://ppmoe.dot.ca.gov/des/oe/bid-inquiries.php
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF THE WORK. The Work consists of demolition of existing 18-inch raw water inlet piping; demolition of existing inlet
Scope of Work/Services: 2.1 The Contractor shall use APC StruxureWare application to monitor all County APC UPS units’ real time.
Scope of Work Each Bidder is to evaluate the area to determine the required square footage amount of flooring material
Scope of Services The project will replace a segment of the 8-inch raw water distribution in a new alignment and
DESCRIPTION OF THE WORK In accordance with Drawings and Specifications prepared by DTN Engineers, the Work includes furnishing of all
This project includes Accounting and Payroll Renovations -rebid
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.