Professional Engineering Design Services for the Golf Course Trails C.O. No. 6527
SCOPE OF WORK The Scope of Work in response to this RFP generally includes a pre-design geotechnical investigation with structural
Become a member for FREE!
*No credit card required*
SCOPE OF WORK The Scope of Work in response to this RFP generally includes a pre-design geotechnical investigation with structural
General Description. Casitas Municipal Water District (District) is soliciting formal bids for the Matilija Groundwater Supply Pilot Well Drilling project.
SCOPE OF WORK Contractor shall furnish and install an aboveground single compartment storage tank (AST) and gasoline dispensing system. The
Scope of Services The work to be done includes demolition of existing curb returns and construction of curb ramp pop-outs,
General work description: Remove and replace asphalt concrete overlay.
PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and