Laguna Creek Trail and West Stockton Blvd. Multi Modal Improvements and Elk Grove Trail Gap Closure
Scope of Services The proposed Work shall be performed in accordance with the plans, specifications and other Contract Documents and
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
ap@cityofchino.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Services The proposed Work shall be performed in accordance with the plans, specifications and other Contract Documents and
SCOPE OF SERVICES Cal Poly is seeking interested and qualified Architects who wish to provide design services for the Student
This Project will replace approximately 85 linear feet of existing storm drain pipe on Commonwealth Avenue and 75 linear feet
This RFQ is requesting quotes from qualified vendors for On-Call Construction Management Services.
General work description: Install cured-in-place pipeliner & reinforced concrete pipe.
Project 204: Convert Existing Facility to Beach Volleyball work includes: demolition of existing softball field facility and information/Wayfinding Kiosk. Installation
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.