HCTP Facility Exterior Painting Project Phase II MI 2619
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
ddo@hacsj.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor,
Scope of ServicesInstallation of Streetlight poles with mast arms, luminaries, metering pedestals, 600-Volt cables, numbering of poles and handholes, Ubicquia
SCOPE OF WORK:Required in this Proposal, understands the construction and project management function(s) is described in the Contract Documents, and
WORK DESCRIPTION: In general, the work consists of clearing and grubbing, excavation of soldier pile piers, installation of erosion control
SCOPE OF WORK :Work specified in the bid proposal and these technical provisions shall be done in accordance with the
SCOPE OF WORK Statement of Work. Contractor shall perform the work described in the “Statement of Work” attached as
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.