Classroom Security Door Lockset Replacement Project District Wide
The scope of work is to replace the hardware and identified doors for Pasadena Unified School District’s elementary schools, middle
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Monique Forrest 323-981-7242
monique.forrest@build-laccd.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
The scope of work is to replace the hardware and identified doors for Pasadena Unified School District’s elementary schools, middle
DESCRIPTION The work to be performed consists of Contractor furnishing all Cooper Lighting LED NVN Safety Fixtures, materials, equipment, tools,
Project Description: The project consists primarily of lining existing sewer pipes based on maintenance history and video inspection. The scope
The work shall consist of, but not limited to Replacement of 1-300ton Chiller and all necessary Hydronic piping, pumps, VFD’s,
SCOPE OF THE WORK The project consists of the structural design and preparation of shop drawings, fabrication of monuments using
Scope of Services The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.