*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

21-07 Arroyo High School Access Compliance Improvements and Intrusion Control Measures

The Project consists of Site Work Paving repair and path of travel upgrades at A. Quad area B. Various concrete walkways C. Asphalt paving area Building Work: Restrooms accessibility compliance safety upgrades for students and staff at building A, B, C, D, F, T Required mechanical, plumbing, electrical, fire - alarm infrastructure upgrades (at upgraded restrooms) Replacement of non-compliant drinking fountains at the path of travel Removal of partial existing covered walkway at the quad area Replacement of various damaged doors and frames

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 07/18/2023 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 06/13/2023 – 11:00 AM
Engineer’s Est: We requested the engineer’s estimate from the agency on 05/30/2023. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:21-07

Ms. Jennifer Edwall
jedwall@slzusd.org

Behrooz Danish,
bdanish@slzusd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 07/18/2023 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.