D49 Metro Air Park Storm Drain Pump Station Phase 2 Project
SCOPE OF WORK A. The following list of components and areas of work is a summary of the work required
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
510-559-8299
Richmond@bpxpress.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK A. The following list of components and areas of work is a summary of the work required
SCOPE OF SERVICES I. Consultant will provide full service, comprehensive property management and maintenance services necessary to maintain and preserve
SCOPE OF WORK The City reserves the right to delete specific task(s) and deliverables: Designs shall comply with all environmental
This project includes BP# 5 Millwork, Polished Concrete, Tile, Painting, Signage, & Window Shades
General work description: Repair pavement, replace drainage systems, and replace guardrail. The Department will receive sealed bids for CONSTRUCTION ON
SCOPE OF WORK 1. The Contractor will provide the Department of Water Resources (DWR), Maintenance and Repair of Orenco Systems®
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.