Entered: 05/22/2020
Updated: n/a

Information

Bid Date: 06/02/2020 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/19/2020 – 10:00 AM
Engineer’s Est. Min: $3263000
Engineer’s Est. Max: $3263000

Agency Contact & Notes

Agency Project #: 1312-1318

Gary Brown Public Works Department 4639 Ben Hur Road Mariposa, CA 95338 Phone: 209-966-5356 Email: gbrown@mariposacounty.org

Project Summary

The works consists of removing and replacing the existing Darrah Road Bridge over West Fork Chowchilla River with a new single span bridge approximately 51 feet in length. The new bridge will be located slightly offset of the original roadway alignment requiring phased construction. The new bridge construction includes spread footings on lean concrete subgrade and a cast-in-place/prestressed deck. The project will also include 10-foot approach slabs and wingwalls on both sides, rock slope protection, and approximately 619 feet of AC approach roadways.

Documents

This content is for Premium members only.

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.

Follow Projects!

Get Notified When:​

  1. New files are uploaded (Addendums, Plans, Specs, Bid Results, … etc)
  2. Questions / Comments are added
  3. No longer search for updated projects on a table
  4. You will be immediately emailed as we make project updates throughout the day

How:

  • Click the gray “Follow” button on the top right corner of the project detail page.
  • You can manage all of the projects you Follow by clicking the submenu “Following List” under the “Projects” menu tab.
  • The “(Total: #)” indicates the subscriber count following this project.