Information

Bid Date: 06/03/2020 – 10:00 AM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 05/26/2020 – 10:00 AM
Engineer’s Estimate: Not Available

Agency Contact & Notes

Agency Project #: 19-20-009

Margie Sanchez, Bond Program Project Coordinator at msanchez@bhusd.org
Ken Haas, Executive Director of Construction and Facilities at khaas@bhusd.org
805-209-5871

Project Summary

The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and complete all work required in connection with Bid No. 19-20-009 Beverly Hills High School Building “A” Refurbishments Rebid (“Project”) in strict accordance with the Contract Documents enumerated in Article 7 below. The Contractor shall be liable to the District for any damages arising as a result of a failure to comply with that obligation, and the Contractor shall not be excused with respect to any failure to so comply by an act or omission of the Architect, Engineer, Inspector, Division of the State Architect (DSA), or representative of any of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents, that the act or omission is preventing the Contractor from fully complying with the Contract Documents. Such protest shall not be effective unless reduced to writing and filed with the District office within seven (7) days of the date of occurrence of such act or omission preventing the Contractor from fully complying with the Contract Documents

Documents

This content is for Premium members only.

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.

Follow Projects!

Get Notified When:​

  1. New files are uploaded (Addendums, Plans, Specs, Bid Results, … etc)
  2. Questions / Comments are added
  3. No longer search for updated projects on a table
  4. You will be immediately emailed as we make project updates throughout the day

How:

  • Click the gray “Follow” button on the top right corner of the project detail page.
  • You can manage all of the projects you Follow by clicking the submenu “Following List” under the “Projects” menu tab.
  • The “(Total: #)” indicates the subscriber count following this project.