Bid Date: 06/03/2020 – 10:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est: We requested the engineer’s estimate from the agency on 05/21/2020. Follow this project to receive further updates.
 

Agency Contact & Notes

Agency Project #: WA – 205

Daniel Vest – 909-334-3367
dvest@cityofchino.org
Bids will be received electronically (online only) via the City of Chino’s PlanetBids portal at https://www.planetbids.com/portal/portal.cfm?CompanyID=26384

Project Summary

Work may include but not be limited to the following: Furnish all labor, materials and equipment to replace an existing 6” steel water main with an 8” PVC pipe, installation of various size valves, water services, fire hydrant assemblies, abandon existing lines and valves, remove and replace cross gutter, overlay asphalt concrete as necessary for trench repair

Documents

This content is for Premium members only.

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.

Follow Projects!

Get Notified When:​

  1. New files are uploaded (Addendums, Plans, Specs, Bid Results, … etc)
  2. Questions / Comments are added
  3. No longer search for updated projects on a table
  4. You will be immediately emailed as we make project updates throughout the day

How:

  • Click the gray “Follow” button on the top right corner of the project detail page.
  • You can manage all of the projects you Follow by clicking the submenu “Following List” under the “Projects” menu tab.
  • The “(Total: #)” indicates the subscriber count following this project.