Entered: 05/19/2020
Updated: n/a

Information

Bid Date: 06/03/2020 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/21/2020 – 2:00 PM
Engineer’s Est. Min: $1100000
Engineer’s Est. Max: $1100000

Agency Contact & Notes

Agency Project #: 0600

email: jimmyz@sanpabloca.gov
510-215-3204 or 510-215-3206
info@sanpabloedc.org

Project Summary

This project consists of: mobilization; traffic control; installation and maintenance during construction of stormwater pollution prevention measures; removal and replacement of concrete curb ramps, sidewalks, valley gutters, and curb & gutters; grinding existing pavement; transport, removal and off haul of grounded materials; placing, spreading, and compacting new asphalt concrete pavement; adjusting utility irons to final grade; protecting existing facilities in place; removing existing pavement markings and striping; installing new pavement markings and striping; cleanup of project site; and demobilizing equipment, tools and manpower from site

Documents

This content is for Premium members only.

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.

Follow Projects!

Get Notified When:​

  1. New files are uploaded (Addendums, Plans, Specs, Bid Results, … etc)
  2. Questions / Comments are added
  3. No longer search for updated projects on a table
  4. You will be immediately emailed as we make project updates throughout the day

How:

  • Click the gray “Follow” button on the top right corner of the project detail page.
  • You can manage all of the projects you Follow by clicking the submenu “Following List” under the “Projects” menu tab.
  • The “(Total: #)” indicates the subscriber count following this project.