Entered: 05/18/2020
Updated: 05/26/2020

Information

Bid Date: 05/28/2020 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/20/2020 – 8:00 AM
Engineer’s Est. Min: $1692000
Engineer’s Est. Max: $1742000

Agency Contact & Notes

Agency Project #: 1800000076
Contact Info: n/a

Project Summary

The Contractor’s scope of work shall include, but not be limited to, the following: Mobilization / demobilization to the site. Pothole as required. Compliance with Water Pollution Prevention and Best Management Practices (BMP’s). Traffic control. Installation of approximately 1,220 linear feet of restrained 16-inch ductile iron pipe in Patt, Commercial and Olive Street. Installation of approximately 650 linear feet of restrained 12-inch ductile iron pipe in Commercial Street. Remove existing DIP cross, tie-in connections, and isolation valves replace as indicated on the Plans. Construct water service replacements as shown on the Plans. Construct fire hydrant assembly (per COA standard detail W-110) and as shown and indicated on the Plans. Removal of existing fire hydrant assembly and bury; abandon-inplace the associated fire hydrant valve as shown on the Plans. Abandon in place existing water main and appurtenances as shown on the Plans. Paving and striping restoration.

Documents

This content is for Premium members only.

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.

Follow Projects!

Get Notified When:​

  1. New files are uploaded (Addendums, Plans, Specs, Bid Results, … etc)
  2. Questions / Comments are added
  3. No longer search for updated projects on a table
  4. You will be immediately emailed as we make project updates throughout the day

How:

  • Click the gray “Follow” button on the top right corner of the project detail page.
  • You can manage all of the projects you Follow by clicking the submenu “Following List” under the “Projects” menu tab.
  • The “(Total: #)” indicates the subscriber count following this project.