Creekside Roof HVAC Replacement
Scope of Services: The testing for Lead Based Paint (LBP) and Asbestos Containing Construction Materials (ACCM) was conducted in accordance with the requirements outlined the “Multifamily Accelerated Processing (MAP) Guide (4430.G) Chapter 9 (9.6.1 Lead-Based Paint and 9.6.2 Asbestos)”. The Asbestos inspection was conducted to identify the presence of any Regulated Asbestos Containing Materials (RACM) (within the specified scope) in accordance with the Federal Environmental Protection Agency Regulation 40 CFR Part 763.85 and the local Air Pollution Control District’s Asbestos Notification and Inspection Requirements.
Creekside Roof HVAC Replacement Read More »