Month: October 2022

Landscape Maintenance Hayward Medians

The work to be done consists in general of furnishing all labor, materials, tools, equipment, and incidentals necessary to provide complete, continuous maintenance of existing automatic and manual irrigation systems; all existing trees, shrubs, flowers, turf, and groundcover, all existing block walls, rock walls, and header boards, all open space areas, all drainage improvements, all concrete areas, all decorative paving and wood structures.

County Service Area (csa) Operation and Maintenance Of Water & Wastewater Treatment Services

The County of San Benito (County) requests proposals from qualified fully licensed and insured firms to provide Professional operation and maintenance services for water and wastewater treatment facilities including all services, supervision, labor, and equipment necessary to provide water and wastewater operations for County Service Area’s (CSA’s) Cielo Vista (CSA 22), Stonegate (CSA 31), and Dunnville (CSA 50).

Sacramento Regional Wastewater Treatment Plant BioGeneration Facility Project

Sacramento Regional County Sanitation District (Regional San) is soliciting Design-Builders to design, build, and provide extended commissioning/transitional operation, and maintenance services for the Sacramento Regional Wastewater Treatment Plant (SRWTP) BioGeneration Project (Project) in Elk Grove, California.

On Call Sewer Repair/replacement/install Services

These projects include, but are not limited, to the following: Repair, replace, and install main lines, manholes, lower laterals, cleanouts, and facilities Restoration or rehabilitation of manholes Some of the supporting activities for the projects include but are not limited to the following: Bypass pumping Cleaning of main lines, manholes, and lower laterals CCTV inspection of main lines, manholes, and lower laterals.

Rialto Parks – Vehicular Gates

The Work comprises all materials, labor, tools, equipment, apparatus, facilities, transportation, testing, incidentals necessary to furnish, all implied requirements, and all appurtenant work as required for the construction of new vehicular gates at multiple city park locations.