Hospital Bed Replacement Tower (RHT) Project
Description of Work: Construction includes the building of a Replacement Hospital Tower (RHT). The RHT is a key piece of
Become a member for FREE!
*No credit card required*
Description of Work: Construction includes the building of a Replacement Hospital Tower (RHT). The RHT is a key piece of
General Description of Work: The work, in general, consists of modifying curb, gutters, curb returns and ADA ramps, relocating the
Scope of Services Preliminary engineering, environmental, and 35% conceptual design for Murrieta Creek Master Drainage Plan Line F (Phase 1).
PROJECT DESCRIPTION: The work to be performed under this contract includes the routine and unscheduled maintenance of stormwater devices at
Scope of Services Update the Central City Specific Plan; Update the Central City Specific Plan Public Facilities Finance Plan; Conduct
The project will rehabilitate approximately 5,150 feet of 30- and 36-inch diameter clay tile lined reinforced concrete pipe (RCP-CTL) on
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.