JOINT OUTFALL G UNIT 8 TRUNK SEWER REHABILITATION PHASE II
The project will rehabilitate approximately 5,150 feet of 30- and 36-inch diameter clay tile lined reinforced concrete pipe (RCP-CTL) on
Become a member for FREE!
*No credit card required*
The project will rehabilitate approximately 5,150 feet of 30- and 36-inch diameter clay tile lined reinforced concrete pipe (RCP-CTL) on
Description of the Project the Alvarado Niles Pipeline Seismic Improvement Project is part of the District’s Water Main Renewal Program
NOTICE IS HEREBY GIVEN that Conejo Valley Unified School District of Ventura County, California, acting by and through its Governing
This Project includes work that will be performed by mechanical, electrical or plumbing (“MEP”) subcontractors that hold “C-7”, “C-10”, and/or
NOTICE IS HEREBY GIVEN that Conejo Valley Unified School District of Ventura County, California, acting by and through its Governing
General Description of Services. General Tree Maintenance Services Provide routine tree trimming, pruning, and maintenance to ensure the health, safety,
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.