REMOVE AND REPLACE POURED-IN-PLACE PLAYGROUND SURFACING
SCOPE OF WORK Project shall include all labor, equipment, and materials necessary to remove existing poured-in-place, prepare existing concrete base,
Become a member for FREE!
*No credit card required*
SCOPE OF WORK Project shall include all labor, equipment, and materials necessary to remove existing poured-in-place, prepare existing concrete base,
Notice inviting bids, plans, specifications and other contract documents for the construction of Bid No. 24-25.16; TOT-LOT ENGINEERED WOOD FIBER
Scope of Services the City seeks an exemplary Utility and Undergrounding and Excavation Contractor that represents all necessary disciplines and
Scope of Services The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work
Scope of Services Project 203-207: Flat Roof Replacement at Buildings E3, S4 & S5. To include Full Roof Replacement, Drains/Drain
Scope of Services The Work shall generally include construction of two (2) permanent 450kW, 480V exterior generators and new 2000A
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.