SCOPE OF WORK Significant Changes in the Character of Work The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
SCOPE OF SERVICE CONSULTANT shall furnish Construction Management personnel to coordinate CONSULTANT operations with the COUNTY for the purposes of managing all aspects of the construction administration for the subject project. For this RFP, Construction Management personnel shall include but not be limited to a Resident Engineer, Assistant Resident Engineer, Roadway Inspector, and Office Engineer and shall be responsible for all matters related to CONSULTANT personnel and coordinated construction activities under this contract. The CONSULTANT shall specify what they believe to be the appropriate amount of staffing for the project. The COUNTY will also have at least one engineer assigned specifically to the project to assist the CONSULTANT.
For questions about the project you can contactChris Brady
cbrady@co.yuba.ca.us -
General work description: The work in general consists of road improvements, curb, gutter, and sidewalk, ADA compliant ramps, striping, signage, storm drainage improvements, transit improvements, street lighting, and Class II bicycle route along Feather River Boulevard in the community of West Linda. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
SCOPE OF WORK The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
SCOPE OF WORK The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us.
-
General work description: The work in general consists of replacing existing drainage culverts crossing Loma Rica Road. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
SCOPE OF WORK The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered
For questions about the project you can contactlaborcompliance@co.yuba.ca.us
-
Scope of Services CONSULTANT shall furnish Construction Management personnel to coordinate CONSULTANT operations with the COUNTY for the purposes of managing all aspects of the construction administration for the subject project. For this RFP, Construction Management personnel shall include but not be limited to a Resident Engineer, Assistant Resident Engineer, Roadway Inspector, and Office Engineer and shall be responsible for all matters related to CONSULTANT personnel and coordinated construction activities under this contract. The CONSULTANT shall specify what they believe to be the appropriate amount of staffing for the project. The COUNTY will also have at least one engineer assigned specifically to the project to assist the CONSULTANT.
For questions about the project you can contactcbrady@co.yuba.ca.us
-
This work consists of installing edge lines, centerlines, delineators, reflectors, and object markers along: Schedule A – All of Old Dobbins Road Schedule B – La Porte Road from Barton Hill Road to the Plumas County Line Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
General work description: The work in general consists of road improvements, curb, gutter, and sidewalk, ADA compliant ramps, striping, signage, and storm drainage improvements along Garden Avenue in the community of West Linda. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
General work description: The work consists of cold planning existing asphalt concrete, placing hot mix asphalt, placing high friction surface treatment, traffic marking and striping, and minor concrete. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
SCOPE OF WORK. The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
Scope of Services The following is a list of anticipated tasks. Consultants are not required to be proficient in or capable of performing all tasks. Consultants shall elaborate on tasks they are capable of performing, including their interrelationship, within their SOQ. The services to be provided for professional consulting services include but not limited to consulting for: Administration Floodplain Management administration National Pollution Discharge Elimination System administration Grant research and application preparation Community Outreach .
For questions about the project you can contactJoshua Usvat (530) 749-5622
jusvat@co.yuba.ca.us -
Summary: General work description: The County of Yuba is accepting proposals for Engineering Design and Construction Support Services for the Linda Ave. and Dunning Ave. Safe Routes to School Project
For questions about the project you can contactDaniel Peterson-Public Works Director
County of Yuba
(530) 749-5642
dpeterson@co.yuba.ca.us -
Scope of Work: The approach to this project will be to prepare a Program EIR that is in compliance with both CEQA and NEPA, with Yuba County serving as the lead environmental agency. The following summarizes the proposed tasks that will be included in a Scope of Work. Contractor will draft a thorough project description in coordination with Yuba County staff and prepare a Program EIR, evaluating the potential environmental impacts of the proposed project based on available existing information, background research, database searches, desktop mapping of existing conditions, and resource surveys that might have been conducted in the proposed project area. It is assumed that project locations will utilize existing Road and Public Utility Easements, or overhead Public Utility Easements of record.
For questions about the project you can contactIan Scott (530) 749-5481
iscott@co.yuba.ca.us -
General work description: This project will look to improve signal hardware: lenses, back-plates with retro-reflective borders, mounting, size, and number; install pedestrian countdown signal heads; implement Leading Pedestrian Intervals at seven; and replace traffic signal controllers at (7) signalized intersections along multiple roadway segments within the County of Yuba listed below. River Oaks Blvd / Plumas Lake Blvd.; Olivehurst Ave / McGowan Pkwy.; Lindhurst Ave / Erle Rd; Lindhurst Ave / North Beale Rd; 5North Beale Rd / Feather River Blvd; Linda Ave / North Beale Rd; and Hammonton Smartsville Rd / Simpson Ln.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
General Work Description: The project will develop a transportation facility – capital improvement plan (CIP) for the urbanized areas of Linda, West Linda, and Olivehurst to accommodate the impacts of climate change. Please note that the project area does not include the incorporated cities of Marysville or Wheatland, nor does it include Beale Air Force Base.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
General Work Description: The work in general consists of replacing the existing Los Verjeles Road Bridge over South Honcut Creek with a new reinforced concrete bridge, placing aggregate base, placing hot mix asphalt, installing guardrail, placing rock slope protection, and traffic striping. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
SCOPE OF WORK: The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable.
For questions about the project you can contactlaborcompliance@co.yuba.ca.us
-
SCOPE OF WORK The Engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
SCOPE OF WORK: Yuba County is seeking proposals from qualified contractors to conduct a tenant improvement at the recently built storage facility known as the DRC Shop, located at 8 7th Street, in Marysville. This work is subject to payment of prevailing wages under Labor Code Section 1720 et. seq. and 1770 et. seq., which require the payment of prevailing wage rates and the performance on certain “public works” and “maintenance” projects, as defined by the Prevailing Wage Laws, and if total compensation is $1,000 or more, contractor agrees, to fully comply with such Prevailing Wage Laws, as applicable.
For questions about the project you can contactHaylee Stowe (530) 749-7880
administrativeservices@co.yuba.ca.us -
SCOPE OF WORK The scope of work includes all labor, materials, tools, equipment, facilities, transportation and services necessary for, and incidental to performing all operations in connection with protection of existing trees as shown on the drawings and as specified herein. 1. Provide tree and plant protection fencing. 2. Remove tree protection fencing and other protection from around and under trees and plants. 3. Clean up and disposal of all excess and surplus material.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
THIS PROJECT INCLUDES West Linda Community Service Hub
For questions about the project you can contactRachel Downs 530-812-3990
rdowns@co.yuba.ca.us -
General work description: The work in general consists of four schedules of work.
For questions about the project you can contactyubacountyprojects@co.yuba.ca.us
-
General work description: The project’s outcomes include a resilient transportation infrastructure that will not be vulnerable to localized flooding during extreme precipitation events along with the addition of multi-modal transportation facilities to promote walking and bicycling. Work will primarily include the installation of storm drain systems, curbs, gutters, sidewalks, ADA ramps, bike lanes, striping, and traffic control devices in the community of Olivehurst, California, encompassing the streets of: full lengths of 2nd Ave, 3rd Ave., 4th Ave., 5th Ave., 8th Ave., Canal St, Beaver Ln., Tulsa Ave. The project also includes the following segments: 6th Ave. from West End to Olivehurst Ave., 9th Ave. from Western Ave. to Olivehurst Ave., 10th Ave from Western Ave to Olivehurst Ave., 11th Ave. from Western Ave. to Olivehurst Ave., and Western Ave. from 2nd Ave. to 11th Ave. Associated road rehabilitation and improvements associated with drainage will also be accounted for in the proposal.
For questions about the project you can contactSamuel Bunton (530) 749-5636
rpontureri@co.yuba.ca.us -
General work description: Friendship Park is a County-owned community park located between Alicia Avenue and Cottonwood Avenue, southeast of Feather River Boulevard. The park is accessible from both Alicia and Cottonwood Avenue. Local Hmong community members have created an informal community garden that encompasses nearly seven acres of the park. The project will enhance and preserve this amazing cultural landmark. The remainder of Friendship Park is largely undeveloped, with less than two acres of land having amenities. The proposed project would add parking, a new BMX track, new pickleball courts, 2 pavilion areas with picnic tables & BBQs, new playground areas, install 6,000′ of accessible walkway/bike path, rehab basketball courts & skateboard area, and decorative fencing
For questions about the project you can contactSamuel L. Bunton (530) 749-5622
jusvat@co.yuba.ca.us -
THIS PROJECT INCLUDES On-Call Quality Assurance Services
For questions about the project you can contactJOSHUA USVAT 530 749-5622
jusvat@co.yuba.ca.us -
General work description: Yuba County Public works is soliciting proposals for public education and outreach activities at Cedar Lane Elementary School, within the community of West Linda, California. Scope of tasks include management and coordination of meetings, printing and disseminating training and informational resources, and conducting student and parent engagement. The purpose is to to facilitate safe pedestrian transportation with regards to walking and bicycling to/from, and around the school while Yuba County performs road improvements in the vicinity. Dissemination materials / deliverables will include printed notes, maps, photos, reports, handouts, flyers, surveys and summary of results
For questions about the project you can contactjoshua usvat (530) 749-5622
yusvat@co.yuba.ca.us -
Summary ~ Post Information The County of Yuba is accepting proposals for on-call quality assurance services for various County construction and capital improvement projects
For questions about the project you can contactJoshua Usvat (530) 7 49-5622
jusvat@co.Y.uba.ca.us -
General work description: Yuba County Public works is soliciting proposals for public education and outreach activities at Cedar Lane Elementary School, within the community of West Linda, California. Scope of tasks include management and coordination of meetings, printing and disseminating training and informational resources, and conducting student and parent engagement. The purpose is to to facilitate safe pedestrian transportation with regards to walking and bicycling to/from, and around the school while Yuba County performs road improvements in the vicinity. Dissemination materials / deliverables will include printed notes, maps, photos, reports, handouts, flyers, surveys and summary of results.
For questions about the project you can contactJoshua Usvat (530) 7 49-5622
jusvat@co.Yuba.ca.us -
The work in general consists of constructing storm drains, a storm drain detention basin, tree removal, paving, and striping on Feather River Boulevard and Cottonwood Avenue in the West Linda area of Yuba County. Other such items or details not mentioned above that are required by the plans, Standard Specifications, or these Special Provisions, and as directed by the Engineer, shall be performed, placed, constructed or installed.
For questions about the project you can contactRobert Pontureri (530) 7 49-5636
rpontureri@co.yuba.ca.us -
General work description: Yuba County is requesting proposals for professional preliminary engineeringand construction support services required for constructing a new well site located at 8334 Rocking WestRanch Trail in Smartsville, CA. The scope of which includes the installation of a new well, and asupervisory control and data acquisition (SCADA) system for the new well and the existing primary welllocated on the same parcel.
For questions about the project you can contactRobert Pontureri (530) 7 49-5636
rpontureri@co.yuba.ca.us