Scope of Services The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to remove the existing composition roof and provide a new composition roof including underlayment, metal flashing, an ice melt system, ventilation improvements, trim, and composition shingles on the North Tahoe Public Utility District’s Administration Building at 875 National Ave., Tahoe Vista, California.
For questions about the project you can contactSuzi Gibbons 530-553-5433
sgibbons@ntpud.org -
Scope of Services The work to be performed under this Contract includes the installation of approximately 2,228 linear feet of 8-inch waterline in Trout Avenue in Kings Beach, CA. The project also includes connections to existing water mains, installation of fire hydrants, customer water services, and pavement restoration. All work is within the Placer County Right of Way.
For questions about the project you can contactSuzi Gibbons 530-553-5433
sgibbons@ntpud.org -
The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to install a new irrigation system including a weather station, controls, main lines, laterals, all connections, sprinkler heads, electrical, excavation, best management practices (BMPs), and site and pavement restoration as shown on the construction drawings and set forth in the Contract Documents. Work will be performed sequentially to maintain maximum usage of the golf course during construction.
For questions about the project you can contactMs. Anna Klovstad
aklovstad@tcpud.org -
Scope of Services The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to construct approximately 250 linear feet of 10-inch water main, valves, fittings, and associated items as shown on the construction drawings.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
Scope of Services The work to be performed for this project consists of all labor, material, tools, equipment and incidentals necessary to construct an approximately 440 square foot building, backup generator, chlorine injection system, access driveway, connections to existing wells, and associated items as shown on the construction drawings.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
The major work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to wall mount (1) 5 ton outdoor air conditioning units, (2) 4 ton outdoor air conditioning unit, (1) 2 ton outdoor air conditioning unit, and (9) indoor air conditioning units, as well as install all associated electrical and refrigerant components including circuit breakers, wiring, conduit, and refrigerant line sets, to provide cooling to the upstairs offices and connect to all existing systems to achieve full functionality of the cooling system. There will be saw-cutting and concrete work required to complete the scope. No trenching, or earthwork, is expected as part of this project. Refer to plans for further information.
For questions about the project you can contactAnna Klovstad (530) 580-6055
aklovstad@tcpud.org -
Scope of Services The Tahoe City Public Utility District is inviting qualified Design-Builders experienced in the design and construction of water distribution systems to submit a Statement of Qualifications (SOQ) for the purpose of competing to be on a short-list to provide Proposals for design and construction services for approximately 50% of the Tahoe Cedars Water System Replacement Project.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
Scope of Services This Bid Request consists of pressure washing, crack sealing, seal coating, and striping of approximately 240,390 sq. ft. of the Truckee River Trail.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
Scope of Services The work to be performed for this project consists of all labor, material, tools, equipment and incidentals necessary to construct approximately 1,000 linear feet of 6-inch sewer main, 19 sewer services, sewer cleanouts, 3 sanitary sewer manholes, pavement replacement, sanitary sewer abandonment, tree removal, bypass pumping, and associated items as shown on the construction drawings.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
THIS PROJECT INCLUDES Progressive Design-Build Services for the Tahoe Cedars Water System Replacement Project
For questions about the project you can contactCory Allison
callison@tcpud.org -
Scope of Services The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to wall mount (2) 5 ton outdoor air conditioning units, (1) 4 ton outdoor air conditioning unit, (1) 2 ton outdoor air conditioning unit, and (11) indoor air conditioning units, as well as install all associated electrical and refrigerant components including circuit breakers, wiring, conduit, and refrigerant line sets, to provide cooling to the upstairs offices and connect to all existing systems to achieve full functionality of the cooling system. No saw-cutting, trenching, earthwork, or concrete work is expected as part of this project. Refer to plans for further information.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 of the General Conditions for the following Project: 2024 REPLACEMENT OF ASPHALT CONCRETE IN VARIOUS LOCATIONS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactMisty Moga
Engineeringbids@ntpud.org -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 of the General Conditions for the following Project: Brockway Fire Protection Water Infrastructure 2024 The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation
For questions about the project you can contactMisty Moga
Engineeringbids@ntpud.org -
SCOPE OF WORK: The major WORK to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to remove existing heating hot water boiler, install a new heating hot water heater system consisting of an air to water heat pump and gas fired boiler and reconnect to all existing systems to achieve full functionality of the heating and cooling system. Refer to plans for further information. Placer County Building Permit is attached, and TRPA permit is not required.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
Scope of ServicesThis Bid Request consists of the installation of a (5) five camera exacqVision system and associated items as specified in the Contract Documents at the Tahoe City Community Center.
For questions about the project you can contactCory Allison 530-580-6329
callison@tcpud.org -
Description: The County of Placer is soliciting proposals from qualified firms to provide professional civil engineering and related services for the Grove Street Intersection Improvement Project located in Tahoe City, California in an unincorporated area of easter Placer County. This RFP will result in the award of one contract for the subject project. This RFP includes a description of the scope of work, proposal requirements, and instructions for submitting your proposal.
For questions about the project you can contactCory Allison (530) 580-6329
callison@tcpud.org -
DESCRIPTION OF WORK :The County of Placer is soliciting proposals from qualified firms to provide professional civil engineering and related services for the Grove Street Intersection Improvement Project located in Tahoe City, California in an unincorporated area of easter Placer County. This RFP will result in the award of one contract for the subject project. This RFP includes a description of the scope of work, proposal requirements, and instructions for submitting your proposal.
For questions about the project you can contactCory Allison (530) 580-6329