The work, in general, consists of removing and replacing non-compliant ADA ramps and damaged concrete sidewalk; constructing curb ramps, curb and gutter, cross gutter, spandrel and sidewalk; removing trees; install metal hand railing; paint pavement markings; and doing other work appurtenant thereto.
For questions about the project you can contactMichael Galvan
Michael.Galvan@sce.com -
San Bernardino County on behalf of Arrowhead Regional Medical Center (County), is procuring an upgrade to Wi-Fi wireless network solution (WiFi upgrade), comprised of hardware, such as access points, mounting systems, and controllers, and including management system software, authentication services. The Wi-Fi solution should be backwards compatible with older Wi-Fi clients, with greater speeds and better connectivity, as well as increased support for multiple, high-bandwidth devices, includes installation.
For questions about the project you can contactAngela Gallegos, Staff Analyst II
Gallegosa1@armc.sbcounty.gov
(909) 580-3433 -
The San Bernardino County Innovation and Technology Department (County) is seeking Proposals from interested and qualified Proposers to provide emergency response, preventative maintenance, repair, and support services for the County’s Halon fire suppression and fire sprinkler systems located at 670 E. Gilbert Street, San Bernardino, CA, 777 E. Rialto Avenue, San Bernardino, CA and 385 N. Arrowhead Avenue, San Bernardino, CA. The number of awards will be determined by the quality of the proposals received.
For questions about the project you can contactAttn: Jeremiah Thomas
(909) 388-0641 Phone
Jeremiah.Thomas@itd.sbcounty.gov -
San Bernardino County is seeking Proposals from interested and qualified Proposers to provide monitoring, preventative maintenance, and unexpected repairs to Arrowhead Regional Medical Center’s underground storage tanks. The number of awards will be determined by the quality of the proposals received.
For questions about the project you can contactAttn: Michael Williams
(909) 580-4292 Phone
Williamsm1@ARMC.SBCounty.gov -
Notice is hereby given that the Project and Facilities Management Department – Project Management on behalf of the Board of Supervisors of San Bernardino County, California, will receive sealed bids on or before 10:00 a.m. on December 18, 2024, in the office of the Project and Facilities Management Department, 620 S E. St, San Bernardino, CA 92415, at which time they will be publicly opened and declared for 800 Mhz Upgrade Skyland Peak Tower in Crestline, California.
For questions about the project you can contactAll technical questions to be submitted to the Project Manager in writing via email at ernesto.gonzalez@pfm.sbcounty.gov.
-
SCOPE OF WORK CONTRACTOR will perform the Work and related tasks as described in Attachment A, Scope of Work hereto and is incorporated by reference into and made a part of this Agreement. This is a non-exclusive Agreement, whereby OMNITRANS may, at its sole discretion, augment or supplant the Work with its own forces or forces of another contractor or entity. CONTRACTOR will cooperate fully with OMNITRANS’ staff or other contractor or entity that may be providing similar or the same Work for OMNITRANS.
For questions about the project you can contactAccountspayable@omnitrans.org
-
SCOPE OF WORK: The work, in general, consists of procurement and installation of 350 linear feet of wrought iron fencing with concrete footing and asphalt patching; procurement and installation of two 20 feet wide double gates along the east and west entrance to the gatehouse; and doing other work appurtenant thereto.
For questions about the project you can contact(909) 387-3373
Jillian.Cole@pur.sbcounty.gov -
SCOPE OF WORK: Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call systems, radio page, school intercom and sound, burglar alarms, fire alarms, and low voltage master clock systems in commercial buildings.
For questions about the project you can contactBryan D. Church
bryan.church@lumen.com -
SCOPE OF WORK On-Call Storm Maintenance Services, for the purpose of this RFQ includes the clearing, removal and disposal of debris of any type, the placement and installation of products to prevent erosion and/or displacement of sediment onto County roads and into District flood control facilities, and snow removal services. In the event of emergencies, rapid mobilization and performance of the work described herein is required.
For questions about the project you can contact(909) 387-1882
DPWProcurement@dpw.sbcounty.gov -
SCOPE OF WORK 6.1.1 Contractor shall provide all materials, labor, equipment, and undertake all efforts necessary or appropriate to construct the Project in accordance with the requirements of the Contract Documents, all governmental approvals, all Applicable Law, and all other applicable safety, environmental and other requirements taking into account the constraints affecting the Project Site. Except as otherwise specifically provided in this Contract, all materials, services and efforts necessary to achieve Final Completion of the Project and elements thereof on or before the deadlines provided in the Contract Documents shall be Contractor’s sole responsibility. The costs of all such materials, services and efforts are included in the Contract Sum.
For questions about the project you can contactBrandon.Barnaby@pfm.sbcounty.gov
-
SCOPE OF WORK Contractor will furnish all materials, labor, tools, equipment, apparatus, facilities, transportation, construction, landscaping, clean-up, and all other construction services of any type necessary to complete all Work in strict conformity with the Contract Documents. Except with regard to any material to be provided and/or installed by County, Contractor shall fully commission and turn over a complete operational and fully functional Project to County. Without limiting the generality of this Section, Contractor shall provide the following Work and services
For questions about the project you can contactBrenton Rankin (909) 771-1168
brenton.rankin@pfm.sbcounty.gov -
SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the rehab of an existing well including the furnishing and installation of pump, electrical, storage tank, booster pump package and piping. Project also proposes the construction of a pipeline on the property from the pump and storage site to the irrigation site, as shown on the Bid Documents, including the Plans and Specifications.
For questions about the project you can contactDeanna Lestina (909)386-8825
Deanna.Lestina@dpw.sbcounty.gov -
DESCRIPTION OF THE PROJECT The project will be located on County owned lots on Palmdale Road just east of Cobalt Road and at the southern portion of 13333 Palmdale Road in the City of Victorville and San Bernardino County. The Campus will consist of fourteen (14) buildings. The Project will include nine (9) buildings and will use the Behavioral Health Continuum Infrastructure Program (BHCIP) Round 5 grant and a grant match using County departmental funds. The remaining five (5) buildings will use the Community Care Expansion (CCE) grant and a grant match using Departmental funds. The treatment housing structures and the Behavioral Health Comprehensive Treatment Campus’ (BHCTC) 74,713 square feet will be located on the 29.47-acre site that will comprise the majority of the Campus. The facility will be occupied by the following entity: Department of Behavioral Health (DBH).
For questions about the project you can contactGil Rios (909) 387-5000
Gil.Rios@pfm.sbcounty.gov -
DESCRIPTION The project will consist of providing Civil/Structural plans with cost estimates and specifications, background investigations and required environmental studies as listed in the approved Caltrans PES form (attached), and subsequent regulatory agency permitting and processing for the proposed project site. The project includes a hydrology study/drainage study per San Bernardino County Flood Control standards to size the bridge/box culvert and extent of channel improvements and transition structures. The plans, specifications and estimates shall conform to the current design standards and guidelines of the City of Yucaipa, San Bernardino County Flood Control, the Specifications for Public Works Construction (SSPWC – Green Book), Caltrans Specifications, and applicable stormwater requirements. All environmental work shall be done using industry standards for such work and compatible with subsequent work to obtain environmental and/or regulatory permits and NEPA and CEQA compliance for federal Highway Bridge Program (HBP) funded projects. In addition, the Consultant shall provide technical support, prepare and submit necessary documentation for approval by Caltrans Local Assistance and attend meetings as required for Project plan approval and receive authorization from Caltrans Local Assistance to construct the project. The City will be responsible for all CEQA processing, notices and approvals.
For questions about the project you can contactLyle Ballard (909) -387-5110
lyle.ballard@res.sbcounty.gov -
THIS PROJECT INCLUDE: Production Floor – Nutrition Center
For questions about the project you can contactJoanna.nord@sbcusd.k12.ca.us
-
DESCRIPTION OF THE PROJECT San Bernardino purchased an un-occupied two-story building located at 303 West 5th Street in the City of San Bernardino. The property includes ground level parking underneath the building’s second floor level, an adjacent surface parking lot and an additional undeveloped lot along 5th Street. This addition to the County’s real estate portfolio will support the overall goal of portfolio optimization, improving County facilities and workplace environments, consolidating like functions to support departmental effectiveness, and the exit of leased facilities as appropriate.
For questions about the project you can contact(855) 800-5046
ePro.Vendors@buyspeed.com -
THIS PROJECT INCLUDE: Ground Lease of Certain Portion(s) of Land at Glen Helen Regional Park for Digital Billboard Use
For questions about the project you can contactLyle Ballard (909) -387-5110
lyle.ballard@res.sbcounty.gov -
SCOPE OF WORK The County proposes to replace three (3) timber bridges (with concrete bridges all located on National Trails Highway (NTH), formerly known as Route 66. This two-lane road holds significant historical and local circulation importance. The segment of the NTH between Ludlow and Mountain Springs Road has been determined to qualify as eligible to the National Register of Historic Places and the California Register of Historical Resources, although not all bridges within this segment are eligible as contributing features.
For questions about the project you can contactRudy Velasquez (909) 387-7920
rudy.velasquez@dpw.sbcounty.gov -
SCOPE OF WORK The work, in general, consists of mill and overlay, full depth reconstruction, construct ADA ramps, curb and gutter, cross gutter, spandrel and sidewalks, install detectable warning surface, construct storm drain, traffic signal modification, paint traffic stripes, pavement markings and doing other work appurtenant thereto
For questions about the project you can contactRobert Figueroa
Rfigueroa2@socalgas.com -
SCOPE OF WORK The Project consists of clearing and grubbing, grading, excavation, backfill; disposal of surplus dirt; removal of rock and concreted rock; removal of existing sewer lines, manholes and appurtenances; removal of existing chain link fences/gates; removal of corrugated steel pipe; grading, construction of concreted rock slope protection; grade stabilization structures; access road and ramps along with various ramps; construction of reinforced concrete box (RCB), head wall; wing wall and cutoff walls; installation of chain link fence/gates; installation of pipe gate; installation of cable railing and metal beam guard railing structures and other work appurtenant thereto.
For questions about the project you can contactDarron Poulsen (760) 246-8638
DPOULSEN@VVWRA.COM -
PROJECT DESCRIPTION Project goal and objectives – Provide monitoring, preventative maintenance and unexpected repairs to ARMC’s underground storage tanks. Deliverables/Requirements: Maintain five (5) 20,000-gallon Diesel storage tanks (Red Dye Diesel). Maintain four (4) 15,000-gallon Propane storage tanks. Maintain one (1) 1,000-gallon Hazardous Waste storage tanks. All-inclusive maintenance of all underground diesel, propane (LPG) and hazardous materials storage tanks (UST) systems includes: Monthly monitoring and compliance management. Preventative maintenance of fuel and environmental monitoring systems. Provide written monthly reports regarding UST systems. Provide hazardous waste removal, when needed. Creation and implantation of in-house industrial hygiene, safety plans and for UST on behalf of ARMC. Annual preparation and electron
For questions about the project you can contactMichael Williams (909) 580-4292
Williamsm1@ARMC.SBCounty.gov -
SCOPE OF WORK:The County of San Bernardino encompasses 20,160 square miles and is the largest county in the continental United States. It borders Los Angeles, Riverside, and Kern Counties as well as the States of Arizona and Nevada. The current population is approximately 2.18 million, the majority of which are located in the southwest portion of the county. San Bernardino County employs approximately 23,080 workers and, in order to provide adequate service to its citizens, has offices located throughout the county, often separated by extensive distances. Inspection, analysis, and review services are used by the County to ensure compliance with Federal and State accessibility standards, codes and regulations including, but not limited to, the ADA Standards for Accessible Design and California Building Code. Contracting with specific qualified providers allows the Risk Management Department to accurately forecast and control costs by using standard fixed rate schedules.
For questions about the project you can contactLoretta Acuna (909) 386-9039
Loretta.Acuna@rm.sbcounty.gov -
SCOPE OF WORK The San Bernardino County Department of Public Works (Department) is responsible for providing construction project management services for the Department’s Transportation projects, including performing the duties of resident engineer and inspectors. This also includes providing the quality assurance and quality control (QA / QC), as well as plan, constructability and structural review services on various projects. The selected Proposer shall provide complete construction project management services for Glen Helen Parkway Bridge Over Cajon Wash project to avoid unnecessary delays in project delivery and to ensure that projects are delivered in accordance with contract requirements.
For questions about the project you can contactMelinda Barnes (909) 387-7920
mebarnes@dpw.sbcounty.gov -
SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, tools, transportation, and other incidentals necessary to complete the Project, including furnishing of all labor, equipment, and materials as required by the specifications for the following reservoirs: (The dimensions are approximate only and shall be field verified by the Contractor prior to bidding.) TANK SIZE DIMENSIONS: TANK 2A – 0.67 MG 60 ft. Dia. x 32 ft. Ht. TANK 2B – 1.0 MG 75 ft. Dia. x 32 ft. Ht. Work to be performed includes modification of miscellaneous structural items to bring the structure into compliance with current safety and health codes, standards and regulations, surface preparation and paints to modifications, handling of hazardous and non-hazardous materials/waste, disinfection of interior surfaces, and other work necessary to accomplish the approved end result of totally protected and usable structures, including attachments, accessories and appurtenances.
For questions about the project you can contactRussel Viloria (909) 386-8823
russel.viloria@sdd.sbcounty.gov -
SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes improvement to the Swim Beach area including dredging, regrading, and placement of a permanent in-water barrier; improvements to South Beach and San Moritz Channel/Basins including dredging and regrading; and improvements to the majority of lake inlet locations along the lake perimeter with the addition of headwall structures and rip rap at some inlets as shown on the Bid Documents, including the Plans and Specifications.
For questions about the project you can contactJon Aldana (909) 386-8801
jon.aldana@dpw.sbcounty.gov -
WORK DESCRIPTION”: The work, in general, consists of milling; pulverize; rubberized chip seal; overlay; ADA ramps update; stripping and traffic signal installation and doing other work appurtenant thereto.
For questions about the project you can contact(855) 800-5046
ePro.Vendors@buyspeed.com -
WORK DESCRIPTION”: The work, in general, consists of constructing embankments; culverts; headwalls; retaining walls; grading; slope protection; asphalt paving; concrete paving; fencing; striping and signage and doing other work appurtenant thereto. Replace “Change Order” at each occurrence in section 4-1.05, “CHANGES AND EXTRA WORK,” with “Change Order or Contract Amendments.”
For questions about the project you can contactRyan Goss 909-585-3219
rgoss@flybigbear.com -
SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the construction of a sewer lift station, underground force and gravity sewage pipeline, manhole and it’s connections and electrical. The lift station and discharge locations include the construction of vaults, antenna tower, wet well and electrical panels. Project also includes the construction of underground electrical conduit, lights, fencing, road repair and vaults as shown on the Bid Documents, including the Plans and Specifications.
For questions about the project you can contactDeanna Lestina (909)386-8825
deanna.lestina@dpw.sbcounty.gov -
SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the furnishing and installation of a solar powered lighting system with buried/anchored poles for the existing basketball court and Linden Ave. parking lot. Proposed project includes the cutting and restoring of concrete and asphalt as shown on the Bid Documents, including the Plans and Specifications.
For questions about the project you can contactDeanna Lestina (909) 386-8825 or email
deanna.lestina@dpw.sbcounty.gov -
SCOPE OF WORK: The contractor shall provide all supervision, labor, equipment, tools, materials, transportation, and incidentals necessary to complete the Project, which will include the demolition and replacement of an existing 220,000-gallon potable bolted water storage tank and replacing it with a new bolted steel water storage tank. The newly installed tank will have an operational volume of 139,112 gallons and be equipped with appurtenances. This replacement of the existing water storage tank includes the installation of the inlet and outlet piping, valves, spools, and fittings, excavation and backfilling, erosion and sedimentation control measures, tank foundation construction, removal of protection posts, and reinstalling electrical and transducer systems, and all other work necessary to complete this project as shown on the Bid Documents, including Plans and Specifications. Please note that the installation of the temporary polyethylene tanks, including the temporary piping, valves, spools, and fittings, will be done “in-house” by the Department of Public Works Special Districts – Water and Sanitation Division or excluded from this bid package.
For questions about the project you can contactRussel Viloria (909) 386-8823
russel.viloria@sdd.sbcounty.gov -
SCOPE OF WORK Contractor will furnish all materials, labor, tools, equipment, apparatus, facilities, transportation, construction, landscaping, clean-up, and all other construction services of any type necessary to complete all Work in strict conformity with the Contract Documents. Except with regard to any material to be provided and/or installed by County, Contractor shall fully commission and turn over a complete operational and fully functional Project to County. Without limiting the generality of this Section, Contractor shall provide the following Work and services:
For questions about the project you can contactRyan.Johnson@pfm.sbcounty.gov
-
The work, in general, consists of portland cement concrete and asphalt concrete bike trail; retaining wall; place fabricated bridge on the Mission Zanja River with concrete abutment and wings, excavation and striping and doing other work appurtenant thereto. This project requires a Class A Contractor’s license issued by the state of California Contractors State Licensing Board. The Contractor must maintain this license from contract award through acceptance. All contractors, including any out-of-state contractors/subcontractors, must comply with all applicable laws and regulations of the State of California at the time of bid and award.
For questions about the project you can contactBen Murguia
Benjamin.murguia@sce.com -
SCOPE OF WORK: The Contractor shall provide all necessary supervision, labor, equipment, materials, and transportation necessary to complete the Project. This includes but is not limited to the following: Demolishing and properly disposing of the existing pedestrian wood bridge, electrical conduit, and wires at the designated bone yard area. Procure a prefabricated steel structure bridge as specified in the Specifications. Construct bridge abutments designed by the bridge manufacturer. Install and finish the new steel structured prefabricated bridge, including installing a concrete floor deck. Install a 6-foot ADA concrete ramp at both ends of the new pedestrian bridge. Provide and install a new “School Bridge” sign. Provide and install a light post with a new electrical conduit and wiring system. Clean and trim the surrounding areas of the newly installed pedestrian steel bridge. Perform all other necessary work to satisfactorily complete this project as shown on the Bid Documents, including the Plans and Specifications.
For questions about the project you can contactRussel Viloria (909) 386-8823
russel.viloria@sdd.sbcounty.gov -
PROJECT DESCRIPTION:Contractors will provide Public Works Maintenance Services to the County as described in this RFQ and the Request for Bid as jobs are scheduled for performance. For the purpose of this RFQ, the term “Public Works Maintenance Services” shall include, but not be limited to, concrete work, crack filling services, traffic control and flagging, traffic striping services, and hazardous waste removal, pavement repair and maintenance services, fence installation services, guardrail repair services. In the event of emergencies, rapid mobilization and performance of the work described herein is required. The Proposer must complete the Public Works Maintenance Services questionnaire and schedule in Attachments D-1 and D-2, specifying the type of services available and service areas for which Proposer will bid as jobs are scheduled. Service pricing is not required for the RFQ at this time.
For questions about the project you can contactCristina Ruvalcaba (909) 387-1882
DPWProcurement@dpw.sbcounty.gov -
PROJECT DESCRIPTION The Consultant will perform services customarily and typically rendered in professional design to accomplish all necessary work. The services involve architecture, landscape architecture, structural, engineering and other relevant fields pertinent to park improvement design and implementation. Expected services include those stated Section V.D, but are not limited to, complete construction design plans, technical specifications, and opinion of probable construction costs based on full design plans (including demolition items and quantities) and technical specifications based on Exhibit E. The construction may require multiple phases depending on the available project budget. The Consultant shall assist the District in identifying what particular scope of work shall be incorporated in a two construction phase approach and provide the necessary construction documents to execute the two phases. The Consultant shall coordinate with the County Environmental Health Department to update Post Closure Land Use Plan (PCLUP) similar to the existing PCLUP, see Exhibit H.
For questions about the project you can contactJon Aldana (909) 386-8801
jon.aldana@dpw.sbcounty.gov -
WORK DESCRIPTION: The work, in general, consists of guardrail replacement at various locations, construction of vegetation control, construction of end treatments, replacement of asphalt concrete dike, reconstruction of overside drains, placing traffic striping, remove of concrete, constructing ADA ramp, construct curb and gutter and sidewalk, and doing other work appurtenant thereto.
For questions about the project you can contactJoseph Forkert (714) 963-6793
joef@forkertengineering.com -
WORK DESCRIPTION: The work, in general, consists of guardrail replacement at various locations, construction of vegetation control, construction of end treatments, replacement of asphalt concrete dike, reconstruction of overside drains, placing traffic striping, remove of concrete, constructing ADA ramp, construct curb and gutter and sidewalk, and doing other work appurtenant thereto.
For questions about the project you can contactJerry Griffith (909) 585-4008
jgriffith@bbccsd.org -
SCOPE OF WORK The project consists of in general demolition of existing rectangular concrete channel and reinforced concrete box culverts; constructing concrete rectangular channel and reinforced concrete box culverts; procurement and installation of precast concrete box sections; installation of temporary shoring; grading; asphalt concrete paving; rock placement, fence removal and fence installation, utility relocation; and other items or details not mentioned above that are required by plans, Standard Specifications and these Special Provisions and other work appurtenant thereto.
For questions about the project you can contact(909) 387-3373
Jillian.Cole@pur.sbcounty.gov -
WORK DESCRIPTION: The work, in general, consists of construction of concrete dike, traversable dike, sidewalk, curb, curb and gutter, ramps, driveways. Placing ashpalt concrete over native soil. and doing other work appurtenant thereto.
For questions about the project you can contactBob Strong (909) 809-9329
Robert.strong@ftr.com -
THIS PROJECT INCLUDES COMMUNITY WALKING TRACK
For questions about the project you can contactJulie Williams 909-476-0590
juliew@lmcci.com -
The work, in general, consists of mill and overlay; sidewalk repair; and replacement of curb ramps with ADA compliant ramps; and traffic signal installation and doing other work appurtenant thereto.
For questions about the project you can contact(855) 800-5046
ePro.Vendors@buyspeed.com -
THIS PROJECT INCLUDES MODULAR OFFICE BUILDING
For questions about the project you can contactAngel Lemus
Alemus@dpw.sbcounty.gov -
PROJECT DESCRIPTION The Project site is located along the San Timoteo Creek between Alessandro Road and San Timoteo Canyon Road in the city of Loma Linda, San Bernardino County, California. The purpose of this work is to repair and stabilize approximately 1,621 linear feet of the existing levees and cross-walls in Reach 3B of San Timoteo Creek. The Project includes levees and cross-walls along portions of basins 16, 17, and 18, and the levees 700 feet upstream of the basins. Approximately 1.9 acres of coastal sage scrub vegetation and 1.73 acres of riparian Mr. Stephen M. Estes (FWS-SB-21B0032-21I0293) 2 woodland will be temporarily impacted by the action, and it would temporarily discharge fill material into 9.08 acres of non-wetland waters of the U.S.
For questions about the project you can contact(909) 387-3373
Jillian.Cole@pur.sbcounty.gov -
SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes demolition of existing dugouts, chain link fence removal and removal of infield and outfield landscaping. Perform a complete renovation of the little league baseball field (Field 2), including grading, installation of new concrete, turf field, brick backstop, dugouts, shade structures, scoreboard, vinyl coated chain link fencing, irrigation and drainage lines as shown on the Bid Documents, including the Plans and Specifications.
For questions about the project you can contactChuck Hernandez (909) 386-8832
charles.hernandez@sdd.sbcounty.gov -
SCOPE OF WORK: Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the improvements to the current 12- inch sewer line that span from Pioneer Point (North) to Trona (South). The 12-inch effluent line spans approximately 11,392 (+/-) linear feet, along the eastern (Lake) side of Trona Road, between Manhole 25 and Manhole 42 as shown on the Bid Documents, including the Plans and Specifications.
For questions about the project you can contactAlfonso Fausto (909) 771-1702
Alfonso.Fausto@sdd.sbcounty.gov -
SCOPE OF WORK San Bernardino County encompasses 20,105 square miles, consisting of a land area of 20,057 square miles and water area of 48 square miles, and is the largest county in the continental United States. It borders Los Angeles, Riverside, Orange, Inyo and Kern counties and the states of Arizona and Nevada. The County’s Innovation and Technology Department is responsible for providing a variety of information technology (IT) services to all County departments, special districts, and other federal, state, and local government agencies. Radio communication facilities, including radio towers and their attached equipment such as feedlines, microwave dishes, radio antennas, and supporting components facilitate mobile and base station radio communications.
For questions about the project you can contactChristine Onyango (909)-388-5943
Christine.Onyango@itd.sbcounty.gov -
SCOPE OF WORK Contractor shall provide all materials, labor, equipment, and undertake all efforts necessary or appropriate to construct the Project in accordance with the requirements of the Contract Documents, all governmental approvals, all Applicable Law, and all other applicable safety, environmental and other requirements taking into account the constraints affecting the Project Site. Except as otherwise specifically provided in this Contract, all materials, services and efforts necessary to achieve Final Completion of the Project and elements thereof on or before the deadlines provided in the Contract Documents shall be Contractor’s sole responsibility. The costs of all such materials, services and efforts are included in the Contract Sum.
For questions about the project you can contactRobert Burton (909) 832-0726
Robert.Burton@pfm.sbcounty.gov -
THIS PROJECT INCLUDES GLEN HELEN ISLAND TOWER BUILDING DEMO & AMENITY INSTALLATION PROJECT
For questions about the project you can contactRobert Burton (909) 832-0726
Robert.Burton@pfm.sbcounty.gov -
Description The site is located in the east side of Prado Regional Park, east of the Prado Reservoir at the southern terminus of a small parking lot in the City of Chino, San Bernardino County, California. The geographic position of the site is Latitude 33.9401855° and Longitude -117.6424579° (Figure 1). Elevation at the site is about 555 feet above sea level. The site is currently partially paved with asphalt and partially unpaved. Vegetation, where occurs, is a light cover of grasses.
For questions about the project you can contactSaretta (909) 522-0427
Saretta.Reed@pfm.sbcounty.gov -
Scope of Services Paint and stucco services
For questions about the project you can contactClaudia Nunez 909-332-6341
cnunez@hacsb.com