SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-15 POOL HEATER REPLACEMENT MCHS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactKashif Shaheed
kshaheed@powayusd.com -
Scope of Work. This Project generally consists of design, construction, installation, and commissioning services for the assessment, testing, maintenance, and filter and CO2 monitor installation for HVAC units at the Sites and pursuant to the CalSHAPE Program requirements, as indicated in the project design specifications and criteria set forth in Attachment 2 to this RFQ/P.
For questions about the project you can contactBrenda Gachuz
bgachuz@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Bid 2025-05 AHS Portable Classroom and Restroom Addition The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactJeff Johnson
jefjohnson@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-07 VAPA THEATER IMPROVEMENTS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation
For questions about the project you can contactjefjohnson@powayusd.com
-
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-11 ROOFING PROJECT CSES The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactJeff Johnson
jefjohnson@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-10 HVAC AND ROOFING BMMS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactJeff Johnson
jefjohnson@powayusd.com -
SCOPE OF WORK Includes all labor, material, and equipment for removal of (2) domestic hot water boilers procurement, and installation of (2) 119-gallon gas hot water heaters, and replacement of (2) thermostatic mixing valves serving the gymnasium at Rancho Bernardo High School.
For questions about the project you can contactGayle McCormick
gmccormick@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-39 ANNUAL ASPHALT AND CONCRETE BID The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactjefjohnson@powayusd.com
-
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-16 PHS AGRICULTURE AREA SITE IMPROVEMENT The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactJeff Johnson (858) 748-0010
jefjohnson@powayusd.com -
SCOPE OF WORK The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-01 ANNUAL PORTABLE BUILDING REPAIRS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactJeff Johnson
jefjohnson@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Bid 2024-21 RHES Portable Classroom Addition The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactGayle McCormick 858.748.0010
gmccormick@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Bid 2024-19 Annual Shade Structure The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactGayle McCormick 858.748.0010
gmccormick@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-03 DISTRICTWIDE TREE MAINTENANCE SUPPORT The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactElan Saleh 858-748-0010
esaleh@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-23 POUR-IN-PLACE SURFACE REPLACEMENTS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactjefjohnson@powayusd.com
-
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-17 PVES Shade Structure Addition The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactsheredianunez@powayusd.com
-
Scope of Work The scope of design is known as LLB Westview High School (WVHS) Expansion, which consists of the following: 1. Site preparation for construction of new building, including landscape improvements, irrigation improvements, and miscellaneous site work and utility improvements. 2. The building itself is roughly 7,300 square feet and consists of a fabrication shop with storage space, (3) classrooms, (3) restrooms, additional storage space, and building support spaces (custodial closet, fire riser, and electrical/IDF rooms)
For questions about the project you can contactJeff Johnson 858-748-0010
jefjohnson@powayusd.com -
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-18 PVES EMERGENCY INVERTERS UPGRADE The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.
For questions about the project you can contactJeff Johnson
jefjohnson@powayusd.com -
THIS PROJECT INCLUDES BID No. 2024-14 THEATRE AV EQUIPMENT
For questions about the project you can contactSharon Heredia-Nunez
sheredianunez@powayusd.com -
Jeff Johnson, (858) 748-0010, Extension 2784
jefjohnson@powayusd.com -
The project involves the construction of two new building structures. Building 14 will comprise 4 classrooms with single occupant restrooms, totaling 4,990 SF. Additionally, Building 15 will include 2 offices and support spaces, totaling 1,940 SF. Furthermore, as part of this project, a new 20′ x 30′ PC-approved shared structure will be installed, encompassing all necessary site work, accessible upgrades, new site paving, demolition of existing handball courts, and exterior painting of existing portable buildings.