Projects for Poway Unified School District

  1. The Poway Unified School District is seeking qualified bids for the project, Pool Heater Replacement MCHS. The project reference number is 2025-15 with a bid deadline on 02/06/2025. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-15 POOL HEATER REPLACEMENT MCHS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Kashif Shaheed
    kshaheed@powayusd.com

  2. The Poway Unified School District is seeking qualified bids for the project, CalSHAPE Ventilation Program Design/Build. The project reference number is 2025-12 with a bid deadline on 01/22/2025. Located in s-San Diego / Imperial county, the project has an estimated budget of 6882510. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    Scope of Work. This Project generally consists of design, construction, installation, and commissioning services for the assessment, testing, maintenance, and filter and CO2 monitor installation for HVAC units at the Sites and pursuant to the CalSHAPE Program requirements, as indicated in the project design specifications and criteria set forth in Attachment 2 to this RFQ/P.

    For questions about the project you can contact

    Brenda Gachuz
    bgachuz@powayusd.com

  3. The Poway Unified School District is seeking qualified bids for the project, AHS Portable Classroom and Restroom Addition. The project reference number is 2025-05 with a bid deadline on 12/23/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 0. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Bid 2025-05 AHS Portable Classroom and Restroom Addition The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Jeff Johnson
    jefjohnson@powayusd.com

  4. The Poway Unified School District is seeking qualified bids for the project, VAPA Theater Improvements. The project reference number is with a bid deadline on 01/15/2025. Located in s-San Diego / Imperial county, the project has an estimated budget of 5000000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-07 VAPA THEATER IMPROVEMENTS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation

    For questions about the project you can contact

    jefjohnson@powayusd.com

  5. The Poway Unified School District is seeking qualified bids for the project, BID 2025-11 Roofing Project CSES. The project reference number is 2025-11 with a bid deadline on 12/04/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 0. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-11 ROOFING PROJECT CSES The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Jeff Johnson
    jefjohnson@powayusd.com

  6. The Poway Unified School District is seeking qualified bids for the project, HVAC and Roofing BMMS. The project reference number is 2025-10 with a bid deadline on 11/14/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 0. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2025-10 HVAC AND ROOFING BMMS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Jeff Johnson
    jefjohnson@powayusd.com

  7. The Poway Unified School District is seeking qualified bids for the project, RBHS Boiler Replacement. The project reference number is Bid 2024-40 with a bid deadline on 06/21/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK Includes all labor, material, and equipment for removal of (2) domestic hot water boilers procurement, and installation of (2) 119-gallon gas hot water heaters, and replacement of (2) thermostatic mixing valves serving the gymnasium at Rancho Bernardo High School.

    For questions about the project you can contact

    Gayle McCormick
    gmccormick@powayusd.com

  8. The Poway Unified School District is seeking qualified bids for the project, Bid 2024-39 Annual Asphalt and Concrete Bid. The project reference number is BID 2024-39 with a bid deadline on 05/31/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-39 ANNUAL ASPHALT AND CONCRETE BID The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    jefjohnson@powayusd.com

  9. The Poway Unified School District is seeking qualified bids for the project, PHS Agriculture Area Site Improvement. The project reference number is BID 2024-16 with a bid deadline on 05/29/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 359000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-16 PHS AGRICULTURE AREA SITE IMPROVEMENT The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Jeff Johnson (858) 748-0010
    jefjohnson@powayusd.com

  10. The Poway Unified School District is seeking qualified bids for the project, Annual Portable Building Repairs. The project reference number is BID 2024-01 with a bid deadline on 03/28/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-01 ANNUAL PORTABLE BUILDING REPAIRS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Jeff Johnson
    jefjohnson@powayusd.com

  11. The Poway Unified School District is seeking qualified bids for the project, RHES Portable Classroom Addition. The project reference number is 2024-21 with a bid deadline on 03/14/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Bid 2024-21 RHES Portable Classroom Addition The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Gayle McCormick 858.748.0010
    gmccormick@powayusd.com

  12. The Poway Unified School District is seeking qualified bids for the project, Annual Shade Structure. The project reference number is 2024-19 with a bid deadline on 02/22/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: Bid 2024-19 Annual Shade Structure The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Gayle McCormick 858.748.0010
    gmccormick@powayusd.com

  13. The Poway Unified School District is seeking qualified bids for the project, Districtwide Tree Maintenance Support. The project reference number is 2024-03 with a bid deadline on 03/07/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-03 DISTRICTWIDE TREE MAINTENANCE SUPPORT The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Elan Saleh 858-748-0010
    esaleh@powayusd.com

  14. The Poway Unified School District is seeking qualified bids for the project, Pour-in-place Surface Replacements. The project reference number is BID 2024-23 with a bid deadline on 02/08/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-23 POUR-IN-PLACE SURFACE REPLACEMENTS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    jefjohnson@powayusd.com

  15. The Poway Unified School District is seeking qualified bids for the project, PVES Shade Structure Addition. The project reference number is Bid 2024-17 with a bid deadline on 02/07/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-17 PVES Shade Structure Addition The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    sheredianunez@powayusd.com

  16. The Poway Unified School District is seeking qualified bids for the project, Lease-leaseback Westview High School Expansion. The project reference number is RFP 2024-24 with a bid deadline on 01/22/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 9700000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    Scope of Work The scope of design is known as LLB Westview High School (WVHS) Expansion, which consists of the following: 1. Site preparation for construction of new building, including landscape improvements, irrigation improvements, and miscellaneous site work and utility improvements. 2. The building itself is roughly 7,300 square feet and consists of a fabrication shop with storage space, (3) classrooms, (3) restrooms, additional storage space, and building support spaces (custodial closet, fire riser, and electrical/IDF rooms)

    For questions about the project you can contact

    Jeff Johnson 858-748-0010
    jefjohnson@powayusd.com

  17. The Poway Unified School District is seeking qualified bids for the project, PVES Emergency Inverters Upgrade. The project reference number is 2024-18 with a bid deadline on 01/12/2024. Located in s-San Diego / Imperial county, the project has an estimated budget of 200000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-18 PVES EMERGENCY INVERTERS UPGRADE The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor’s failure to comply with this obligation.

    For questions about the project you can contact

    Jeff Johnson
    jefjohnson@powayusd.com

  18. The Poway Unified School District is seeking qualified bids for the project, BID No. 2024-14 Theatre AV Equipment. The project reference number is 2024-14 with a bid deadline on 10/19/2023. Located in s-San Diego / Imperial county, the project has an estimated budget of 0. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    THIS PROJECT INCLUDES BID No. 2024-14 THEATRE AV EQUIPMENT

    For questions about the project you can contact

    Sharon Heredia-Nunez
    sheredianunez@powayusd.com

  19. The Poway Unified School District is seeking qualified bids for the project, Annual Fencing. The project reference number is 2024-06 with a bid deadline on 09/21/2023. Located in s-San Diego / Imperial county, the project has an estimated budget of 0. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary: For questions about the project you can contact

    Jeff Johnson, (858) 748-0010, Extension 2784
    jefjohnson@powayusd.com

  20. The Poway Unified School District is seeking qualified bids for the project, Lease-leaseback Abraxas High School New Building Structures. The project reference number is 2024-10 with a bid deadline on 09/06/2023. Located in s-San Diego / Imperial county, the project has an estimated budget of 7400000. Sign up with BidAmerica to access complete project details, including the Plans & Specs. Summary:

    The project involves the construction of two new building structures. Building 14 will comprise 4 classrooms with single occupant restrooms, totaling 4,990 SF. Additionally, Building 15 will include 2 offices and support spaces, totaling 1,940 SF. Furthermore, as part of this project, a new 20′ x 30′ PC-approved shared structure will be installed, encompassing all necessary site work, accessible upgrades, new site paving, demolition of existing handball courts, and exterior painting of existing portable buildings.

    For questions about the project you can contact

    Brenda Gachuz
    bgachuz@powayusd.com